Why Choose BVEM Piling Rig?
- 50 years of specialized foundation expertise.
- High-output torque with stable power head design.
- Seamless operation in narrow passages and height-restricted working conditions.
- Optimized fuel efficiency, single-layer winch rope winding for longer service life.
- Fast transportation and quick setup(transition times as fast as 20 minutes on select models).
- Compliance with global emission standards (equipped with China III, China IV, and Euro V compliant engines).
BVEM Piling Rig: Intelligent Power Regulation, Safe & Worry-free Construction
The main winch motor adopts adaptive load intelligent control, which automatically adjusts power according to your construction load. No frequent manual adjustment is required, saving fuel and labor while adapting to various complex working conditions.
Equipped with our self-developed embedded intelligent control system, the piling rig comes with a built-in fault diagnosis function. It enables real-time monitoring and clear data display of the whole construction process, gives early warning and automatic feedback of equipment faults, reduces downtime maintenance, and saves you trouble and construction delay.
We sincerely invite you to place orders and partner with us for successful projects!
Piling Rig Series




- Max. Torque:135 kN·m
- Max. Drilling Diameter:1300 mm
- Max. Drilling Depth:40(MZ)/32(JS)m

- Max. Torque:175 kN·m
- Max. Drilling Diameter:1500 mm
- Max. Drilling Depth:50(MZ)/40(JS)m


- Max. Torque:245 kN·m
- Max. Drilling Diameter:2500 mm
- Max. Drilling Depth:67.5(MZ)/53(JS)m

- Max. Torque:280 kN·m
- Max. Drilling Diameter:2500 mm
- Max. Drilling Depth:80(MZ)/54(JS)m

- Max. Torque:280 kN·m
- Max. Drilling Diameter:2100 mm
- Max. Drilling Depth:80(MZ)/54(JS)m

- Max. Torque:360 kN·m
- Max. Drilling Diameter:2500 mm
- Max. Drilling Depth:93(MZ)/62(JS)m

- Max. Torque:405 kN·m
- Max. Drilling Diameter:2600 mm
- Max. Drilling Depth:99(MZ)/66(JS)m
Why You Need BVEM Piling Rig?
BVEM delivers reliable bored pile construction in confined spaces and challenging geology, offering excellent low-clearance capability, strong rock penetration, fast mobilization, and low operating costs for cost-effective pile foundation projects worldwide.

Detachable low-clearance mast excels in height-restricted and narrow urban sites.

High-torque power heads ensure efficient drilling through soil, pebble, and hard rock layers.

Single-vehicle transport with drill pipe intact and transition times as fast as 20 minutes.

Optimized fuel consumption (up to 15% savings) and single-layer winch rope for reduced maintenance.

China III/IV and Euro V engines meet international environmental standards.

Supports diameters up to 2600 mm and depths to 99 m across residential to infrastructure projects.
BVEM Piling Rigs: Powerful, Fuel-Efficient, Reliable in All Conditions
BVEM piling rigs are equipped with original large-displacement electronically controlled fuel injection engines from well-known brands. With strong power and a maximum torque of up to 405kN·m, fuel efficiency is improved by 15%, delivering stable and powerful output, excellent economy, and environmental performance for you. It ensures consistent power even on plateaus, in harsh weather, and other remote working conditions, eliminates power lag, and fully removes your concerns about construction delays caused by insufficient power.

Professional Piling Rig Manufacturer Backed by 50 Years of Foundation Expertise


BVEM operates state-of-the-art facilities featuring a 5,000㎡ R&D center, 17,000㎡ standardized production workshop, 4,000㎡ testing base, and 5,000㎡ office complex. With strict quality control and advanced manufacturing capabilities, we deliver reliable piling rigs that meet international emission and performance standards for global pile foundation projects.
BVEM Piling Rigs – Reliable Solutions for Diverse Pile Foundation Challenges
BVEM piling rigs are engineered to solve real foundation issues in confined urban sites, utility projects, and infrastructure works. With low-clearance masts, high-torque rock penetration, and fast mobilization, they deliver efficient bored pile performance across varied geology and project scales.

BVEM40 and BVEM90 excel in narrow residential sites with their ultra-compact design and low-clearance mast, enabling easy access and fast pile installation for small-scale foundations.
Client Stories with BVEM Piling Rigs
Yes. Our rigs feature detachable low-clearance masts and compact chassis, making them ideal for urban sites, height-restricted areas, and narrow access projects while maintaining high stability and efficiency in bored pile construction.
BVEM piling rigs deliver strong rock penetration thanks to high-torque power heads. They efficiently handle soil, pebble, and hard rock layers across models ranging from 40 kN·m to 399 kN·m torque, ensuring reliable performance in demanding ground conditions.
Most models support single-vehicle transport with the mast and drill pipe intact. Transition times can be as fast as 20 minutes, significantly reducing downtime and mobilization costs on busy construction sites.
Yes. Engines are available with China III / China IV and Euro V compliance, helping contractors meet global environmental regulations while offering excellent fuel efficiency and lower operating costs.
We offer professional model selection based on your geological report, pile diameter, depth, and site conditions. On-site commissioning, operator training, and full technical support are available to ensure smooth project execution.
Single-layer winch rope winding extends rope life, while easy-access engine and hydraulic components, plus optional centralized lubrication, simplify maintenance and minimize downtime.

















